Monday, 9 April 2012

Editing Day 2...


The 27th of March was the second/final day of our 5hour editing. The day started of chaotic as our music from the day before had deleted and  refused to cooperate with us by going back on this took up a vast majority of our time (2-3 hours) just to sort out the music. By lunch we had thought it was all a shamble but with the help of another student we managed to sort the problem out and move on.
 Another thing that came to surface that had was the thrill that thrillers are meant to have but ours didn't have. The opening scene to our thriller needed music that would send shivers down the audience spine but there was none already installed in the programme that would could use and Youtube was blocked on our computers so we couldn’t get it off there or some other sites. After another hectic time we finally found a website that allowed use to download and wasn’t blocked which was a complete life saver for us. Everything from then on went well and we have a difficult but successful day.

As this day was full of unprepared surprises we also decided on a production name which was the cherry on top of our day, we decided to call it……..


Trial production because this day was full of trials that we kept going up against and conquered so we thought it worked well.

WWW- What went well:
·         We actually completed our film
·         We kept going even thought things looked like a shambles
·         We finished our preliminary task as well and all contributed ideas and help throughout the 2 days of editing

EBI- Even better if:
·         We had decided and found the music before rather than leaving it till last minute
·         We were better acquainted with using the iMac and iMovies before
·         Used the time more effectively

 
working hard 


 
having a fun moment as Trial Productions 


No comments:

Post a Comment